Intrinsicly evisculate emerging cutting edge scenarios redefine future-proof e-markets demand line

GALLERY POSTS

OFFICE MAPS

Project Details

Commercial Development

Effective Solution For Your Business

As part of an agreement with Meliá International, the global hospitality brand awarded the operating contract for a large-scale hectare development located on Jamaica’s North Coast, LIMCO was selected to provide comprehensive electrical engineering design services for the project. This engagement reflected LIMCO’s proven expertise in delivering complex engineering solutions for major hospitality developments that require reliability, efficiency, and strict adherence to international standards.

  • YEAR: 2015
  • LOCATION: Jamaica’s North Coast
  • TAG: ELECTRICAL, SOLUTION
PROJECT Meliá International

The Challenge of Projects

LIMCO’s responsibilities included the detailed design of electrical systems serving the hotel’s public areas, with a strong focus on safety, functionality, and long-term operational performance. These designs ensured adequate power supply for lighting, mechanical systems, and guest-facing amenities, while meeting applicable local and international electrical codes and supporting the overall architectural vision of the property.

Beyond public-area electrical systems, LIMCO also designed the critical supporting infrastructure required to sustain the facility’s daily operations. This included the development of robust power distribution systems capable of supporting the hotel’s full load demands and allowing for efficient energy management across the property.

Project Requirements

  • Comprehensive electrical engineering design for all public areas of the hotel, including lighting, power, and life-safety systems

  • Design of a reliable and scalable power distribution network to support current and future load demands

  • Compliance with local Jamaican regulations and applicable international electrical and energy standards

  • Integration of electrical systems with water supply and sewage treatment infrastructure

  • Coordination with architects, operators, and other engineering disciplines to ensure seamless system integration

  • Emphasis on energy efficiency, operational reliability, and long-term sustainability of the facility

Additionally, LIMCO coordinated electrical engineering designs associated with essential utility systems such as water supply and sewage treatment facilities. By integrating these systems into the broader infrastructure framework, LIMCO helped ensure the hotel operated efficiently, sustainably, and reliably, contributing to the long-term success of the development on Jamaica’s North Coast.

Project Results

The project resulted in a fully coordinated, code-compliant electrical engineering design that supported the successful development and operation of The Braco Hotel. LIMCO’s work delivered reliable power distribution, efficient public-area electrical systems, and seamless integration with water and sewage treatment infrastructure, ensuring safe, uninterrupted operations. The completed designs met both local and international standards, supported energy-efficient performance, and provided a strong technical foundation for Meliá International’s long-term operational needs on Jamaica’s North Coast.